I have installed the BPM and ODM on traditional HW architecture like AIX LPARs. My setup is as below.
We have 2 nodes for Production and 2 Nodes for UAT environment.
On each Node in Production and we have installed and configured the BPM and ODM using WAS ND. We have allocated the 2 cores each on Production Node and 1 core each on UAT Nodes.
we have IBM Cloud Pak for Business Automation Entitlement.
When it comes to license calculation for VPC how do i calculate it , do I need to consider the both BPM and ODM for the VPC calculations.
Appreciate if anyone help me on the above query.
------------------------------
Suresh Babu Sambasivam
------------------------------