Originally posted by: shchwang
Dear All,
I am using CPLEX to solve the attached problem. But after running it I get:
Tried aggregator 1 time.
MIP Presolve eliminated 55 rows and 0 columns.
Reduced MIP has 189 rows, 99 columns, and 579 nonzeros.
Reduced MIP has 27 binaries, 0 generals, 0 SOSs, and 0 indicators.
Presolve time = 0.00 sec. (0.23 ticks)
Root node processing (before b&c):
Real time = 0.00 sec. (0.58 ticks)
Parallel b&c, 8 threads:
Real time = 0.00 sec. (0.00 ticks)
Sync time (average) = 0.00 sec.
Wait time (average) = 0.00 sec.
------------
Total (root+branch&cut) = 0.00 sec. (0.58 ticks)
MIP - Integer infeasible.
Current MIP best bound is infinite.
Solution time = 0.00 sec. Iterations = 0 Nodes = 0
Deterministic time = 0.58 ticks (171.52 ticks/sec)
So why did this happen? Is CPLEX unable to find a solution that meets my objective and satisfies the constraints?
Any help will be highly appreciated.
Regards.