Originally posted by: cassetta
I have implemented the single machine scheduling problem with release date constraints, with maximum lateness objective. The model file is:
using CP;
int nbJobs = ...;
range Jobs = 0..nbJobs-1;
int jobDurations
j in Jobs= ...;
int ReleaseDates
j in Jobs= ...;
int DueDates
j in Jobs= ...;
dvar interval jobs
j in Jobs in ReleaseDates[j] .. maxint size jobDurations[j];//dichiarazione array di variabili intervallo
minimize max(j in Jobs)
maxl(0,endOf (jobs[j]- DueDates[j]));
The error message in the last line of the model is:
Operator not available for dvar interval - int.
#DecisionOptimization#OPLusingCPLEXOptimizer