It's me again!
The below issue was discovered in version 12.5.
Our attempts to change an existing allocation strategy configuration appear saved, but have no effect.
We logged case 148046. If you find this issue is affecting you, please reference our case and alert your CSM et al.
Here are repro steps performed on a modeled table called "Validation File Check" allocating into "Cost Source". To determine if this is a problem for you as well, sub "Validation File Check" with another modeled table. I also caution you to create a branch to test.
- Go to Validation File Check modeled table.
- Ensure you’re positioned on the Model step.
- Set the Select a metric dropdown to “Cost Validation Metric 1”.
- Click the Add Allocation button.
- In the To section, set the “Choose the object to allocate to” dropdown to “Cost Source”.
- Click on the Apply button.
- Verify cost 100% allocated and evenly spread by reviewing the Destination tab.
SPECIAL NOTE: Notice the Expense Type values. You should see more than “OpEx”. For example, “CapEx” and/or “OpEx Budget” should be listed. If not, go to another fiscal period where those values are observed in addition to “OpEx”. - In the Distributing section (of the allocation strategy’s config), enable the Data Relationship checkbox.
- For the Source Colum and Destination Column, set to the “Expense Type” field.
- Click on the Apply button.
- Review the Destination tab again.
- Notice the allocation affected rows in addition to “OpEx”. With the Data Relationship definition, only the “OpEx” rows should have been allocated onto.