Hi Community,
I'm working with DOORS 9.7 using baseline sets. I thought these were useful in teh frame of phased development, as you can baseline a first module, then a second later on. The issue is that when baselining the second module, the baseline set doesn't retain the new links between module 1 and 2. What am I doind wrong? I haven't closed the baseline set in the meantime.
Thank you,
------------------------------
Anne
------------------------------