Thank you.
Original Message:
Sent: Tue February 18, 2025 10:08 AM
From: Evelyn Perez
Subject: My BP and I need some clarification re IBM i Systems attached to FlashSystem or SVC must be converted to use FlashSystem NPIV before upgrading to 8.7 or higher
Hi Robert,
The instructions here are meant to provide clear guidance, so if there's something specific that is unclear my team and I are happy to help with it.
Here are some surrounding reference documentation you/your BP may find helpful:
https://www.ibm.com/docs/en/flashsystem-7x00/8.6.0?topic=c-configuring-n-port-id-virtualization
https://barrywhytestorage.blog/2020/02/25/introducing-spectrum-virtualize-7-7-0-part1/
https://www.insidestoragenetworking.com/2022/07/spectrum-virtualize-npiv-and-host.html
additionally there is a dedicated Chapter in the Best Practices Redbook for NPIV with VIOS and for IBMi generally. It is more complex for Direct attach due to the behaviour of the device drivers, but for Switch attach, we've been doing this since 2017/2018 in anger.
I hope this helps!
------------------------------
Evelyn Perez
IBM Senior Technical Staff Member
IBM Storage Virtualize Software Architect for SVC and FlashSystem
Original Message:
Sent: Tue February 18, 2025 09:51 AM
From: Robert Berendt
Subject: My BP and I need some clarification re IBM i Systems attached to FlashSystem or SVC must be converted to use FlashSystem NPIV before upgrading to 8.7 or higher
Parts of this are outside of my comfort zone. So I thought I'd pull in the BP.
The asset from the BP realized this is outside of his comfort zone so he finally pulled in a storage engineer to assist.
I'm giving that tea some time to brew.
------------------------------
Robert Berendt IBMChampion
Business Systems Analyst, Lead
Dekko
Fort Wayne
Original Message:
Sent: Tue February 18, 2025 05:47 AM
From: Evelyn Perez
Subject: My BP and I need some clarification re IBM i Systems attached to FlashSystem or SVC must be converted to use FlashSystem NPIV before upgrading to 8.7 or higher
Hello!
Can you specify what is confusing from the support page linked?
There are 2 paths that are described -
Path 1 - if you use switches you follow the instructions under For IBM i systems that are attached using a Fibre Channel SAN
Path 2 - if you are direct attaching the host to your storage, you follow the instructions under For IBM i systems that are Directly Attached using a Fibre Channel cable without any switches.
Can you please clarify what is unclear as these seem a logical ordering of steps.
------------------------------
Evelyn Perez
IBM Senior Technical Staff Member
IBM Storage Virtualize Software Architect for SVC and FlashSystem
Original Message:
Sent: Mon February 17, 2025 09:13 AM
From: Robert Berendt
Subject: My BP and I need some clarification re IBM i Systems attached to FlashSystem or SVC must be converted to use FlashSystem NPIV before upgrading to 8.7 or higher
My BP and I need some clarification regarding "IBM i Systems attached to FlashSystem or SVC must be converted to use FlashSystem NPIV before upgrading to 8.7 or higher" at https://www.ibm.com/support/pages/node/7159521
Current our FS7300 is at 8.6.0.5. We're thinking about going to 8.7. But the link above has us confused as to what is to be done.
Our FS7300 supports two P10's. The P10's are hosting that SAN disk via VIOS 7200-05-07-2346 to lpars of IBM i 7.5 TR5 and AIX 7.3 7300-02-01-2346
------------------------------
Robert Berendt IBMChampion
Business Systems Analyst, Lead
Dekko
Fort Wayne
------------------------------