Originally posted by: SystemAdmin
1) Can the following that are running 5.2.X update right to 5.3.9 SP2 or does the upgrade have to go in steps?
AIX Level: 5200-10-04-0750
System Model: IBM,9133-55A
AIX Level: 5200-10-04-0750
System Model: IBM,9133-55A
Machine Serial Number: 067232H
AIX Level: 5200-08-CSP
System Model: IBM,7038-6M2
AIX Level: 5200-10-04-0750
System Model: IBM,7026-M80
Following running at 5.3:
AIX Level: 5300-06-04-0748
System Model: IBM,7047-185
2) Can I go from 5.3.6 right to 5.3.9 SP2? Note: CD for test_server to 5.3.9 SP2 ordered online 1/6/09.
3) For the 2 servers running via a HMC (the 0133-55As), does the OS upgrade have to be done via HMC or can it be upgraded straight from CD like on the M80, 6M2 and 7047 running with no HMC?