IBM Accelerator Catalog
IBM Accelerator Catalog

Gantt

This sample custom visualization is a type of bar chart that illustrates a project schedule.

Slide Two

About this accelerator

Gantt visualizations show the dependency relationships between activities and current schedule status. They list the tasks to be done on the vertical axis, and time intervals on the horizontal axis. The width of the horizontal bars in the graph shows the duration of each activity. Gantt visualizations illustrate the start and finish dates of the elements and summary elements of a project.

Next Steps: To use this file, click the blue Download button above and save the ZIP file to your local computer. Do not unzip this file. Next, log in to IBM Cognos Analytics and upload the file. For step-by-step instructions on how to build this visualization using sample data, see Gantt visualization.


Download Source Code

To view the source code for the Gantt sample custom visualization, go to this public GitHub repository. To download the files, navigate to the root of this directory and click the green Code button.

Note: This feature is intended for an advanced custom visualization developer. It is a code sample with specific requirements that provides an opportunity for developers to extend their visualizations. If you are not a visualization developer, IBM Cognos Analytics comes with a full set of powerful visualizations that are ready to use.


More information

Additional details

  • Accelerator typeVisualization
  • IndustryAny
  • Business functionAny
  • Product and version Cognos Analytics - 11.1.6 to Current
  • Author typeIBM
  • Company nameIBM
  • Author name IBM
  • Last modifiedJune 5th, 2020
  • Language English