♦ Applies to: Apptio TBM Studio R12.3+
Apptio Uplifted Content
This topic was contributed by an Apptio expert and Technical Support Engineer @George _.
In TBM Studio, you click the Close Branch button on the Project tab. However the branched project cannot be closed and you receive a warning message similar to the following:
The branch you tried to close was created from the build that is currently in your Production environment and is, therefore, in use.
You will need to promote the next build from Staging, to Production (How?), in order to close the branch.
TIPS
This article is open for your feedback. At the bottom of this screen click Add a comment.