Webcast Archives

ASAP University: WAPL – Using Automation to Do More in Less Time 

03/15/17 01:01 PM

Workload Automation has always been a tough mountain for developers to get on top of. Usually the reserve of dedicated scheduling teams and operators, often it gets saved only for Production. Your developers spend their testing time running things manually and reinventing the wheel. Anything that heads to Production generally gets built by hand with the scheduling definitions often being "tested" by eye, or the first time they run.

IWS for zOS 9.3 introduced Workload Automation Programming Language (WAPL), which allows you to bring scheduling to the application lifecycle, saving Dev time and highlighting scheduling issues early. Many more things can be automated and integrated, such as clean-up and adhoc changes saving Ops time too.

Learn why and how Roy Verweij implemented WAPL at Belastingdienst and the impact it has had on his company.

Speaker: Roy Verweij, System Engineer for IBM Workload Scheduler for z/OS and System Automation for z/OS at Belastingdienst, started his IT career at the Dutch Tax Administration in 2001 and has been working with Workload Scheduler since 2004. Roy is responsible for innovation of the IBM Workload Scheduler installation at the company. Roy holds a bachelor degree in Business Administration. Roy's last name caused Brian Fitzgibbon to use a text-to-speech program because he feared mispronouncing it.

Statistics
0 Favorited
2 Views
0 Files
0 Shares
0 Downloads