PowerVM

Power Virtualization

Learn about the virtualization technologies designed specifically for IBM Power including #PowerVM, #PowerVC, #VM Recovery Manager#HCM/CMC, and more.


#Power
#TechXchange Conference Lab


#Servers
 View Only
  • 1.  Simplified Remote Restart GUI

    Posted 08/25/17 01:33 PM

    Originally posted by: snyder


    We currently do not run Power VC and so we have to activate and validate SRR via CLI on the HMC.

    Are there plans to add a GUI to the HMC to help with this function?

    Will auto cleanup be enabled?

    Thanks,

    Rick


    #HMCandCMC
    #feedback-on-the-enhanced-user-interface


  • 2.  Re: Simplified Remote Restart GUI

    Posted 08/25/17 11:43 PM

    Originally posted by: sashok


    The only SRR GUI for HMC is the LBS automation tool.  You can see a video on this tool at https://youtu.be/zH4eIg7wza8

     

    HMC 8.5 introduced auto cleanup on the source system after a successful RR.


    #feedback-on-the-enhanced-user-interface
    #HMCandCMC


  • 3.  Re: Simplified Remote Restart GUI

    Posted 08/28/17 04:53 PM

    Originally posted by: Bob_Foster


    There is another video that shows the PowerVM LPM/SRR Automation Tool in action.  Its quite simple to do SRR with the tool and when the you need to move the partitions (LPARs) back to the server after its repaired....the tool can move everything back in just 3 clicks.  Of course, you can move things back one at a time or in groups...all those types of features are in the tool.

     

    Here's the other URL on the tool performing SRR.

    ibm.biz/SRR_tool

     

     


    #feedback-on-the-enhanced-user-interface
    #HMCandCMC