Hello,
We have a AIX V6.1 (6100-06-12-1339) running an old application. We cannot updta eto the latest level to migrate on Power8( Application doesn't work with this level).
It's hosted on Power7(9117-MMB).
We need to move this last partition on Power8, but each time I try to restore the mksysb in a WPAR hosted on AIX V7.1-7.2 LPAR,I have the following message :
x 0 ./DIGITAL_ENGINE
x 0 ./mnt
total size: 5563874160
files restored: 104533
populate: 0960-667 The operating system level within the workload partition is not supported.
mkwpar: 0960-396 Failed to populate workload partition lpar1.
The LPAR can be with AIX V7.2 or V7.1, it's the same message.
I cannot have support from IBM and don't find documentation about the mistake I should do.
Does anyone have more information to complete this restore so I can host the 6.1 LPAR in a new WPAR on Power 8 please?
Thank you for your help.
Christian SONOLET
FRANCE
------------------------------
Christian SONOLET
------------------------------