PowerHA for AIX

PowerHA for AIX

Connect, learn, share, and engage with IBM Power.

 View Only
Expand all | Collapse all

Power HA 6.1: Parallel or serial processing of Resource Groups in Failovers

  • 1.  Power HA 6.1: Parallel or serial processing of Resource Groups in Failovers

    Posted Tue August 17, 2010 10:23 AM

    Originally posted by: MatthewBourne


    Folks

    I have a 2-node cluster, with 7 resource groups.
    In a controlled stop of Power HA on one side, all resource groups on that side failover to the other node in parallel.
    If I take down a network on one side, however, the resource groups are failed over to the other node sequentially.

    Has anyone else come across this?

    M.


  • 2.  Re: Power HA 6.1: Parallel or serial processing of Resource Groups in Failovers

    Posted Tue August 24, 2010 06:42 PM

    Originally posted by: SystemAdmin


    I did not see any semi-recent APARs related to an issue like this, but its probably best to generate a 'snap -e' and open a PMR in this case.

    --Brandon


  • 3.  Re: Power HA 6.1: Parallel or serial processing of Resource Groups in Failovers

    Posted Thu December 09, 2010 03:26 AM

    Originally posted by: MatthewBourne


    Folks

    See: http://www-01.ibm.com/support/docview.wss?uid=isg1IZ75215 for a solution.

    I upgraded to PowerHA 6.1 SP2 and applied the corrective action described in this APAR. Now all resource groups failover in parallel when a network_down event is processed.

    M.