Hello Guys,
I have a need to point two non-clustered Integration Servers to the same TN DB. From this thread here I concluded that it is safe to do so. But I have a situation here. One of the two Integration Servers is a B2B node which is already connected to the TN DB. So it has all the components needed to be able to a B2B node. The other is only an A2A node and needed to be converted to B2B node to be able to use TN.
Is there a checklist or cheatsheet to make it the clean way? I have filed the differences from the IS About page and the package updates page. Is it clean way to copy the the missing packages and other artifacts from the B2B node to the A2A node? Any other ideas?
Thanks
Guna
#webMethods#B2B-Integration#Integration-Server-and-ESB