I'd love some examples of 'what not to do in the real world' so I can simulate high memory and/or cpu. Huge XML messages with a CopyEntireMessage procedure in a load test just isn't cutting it. I'm thinking infinite loops, poorly coded procedures, really anything that would kill the performance of a flow.
I'm running ACE 12 lts on OpenShift and am using a Quick Start integration server (368mb memory, .3 cpu). At the moment I'm looking to test HPA from an infrastructure side and am not really an ESQL developer. Any help on what not to do in real life, so I can get some pretty poor performance would be greatly appreciated. Extra points for creativity!
Matt
------------------------------
Matt
------------------------------