Yes, @Anshu Dhawan. Follow @Jenny Franklin's steps in the other thread and it'll work. The Datalink connector is called
Copy table.
We have 2 such tables that we feed from reports on a scheduled basis. It's the only way we found to load metric values into tables, as transforms will not allow using LookupObjectUnitValue() calls, they work only in reports or allocation lines.
I hope this is not too cryptic πππ€βββ