Hi
We are planning to upgrade from 4.6 to 6.5 . Its a complete B2B upgrade (EDI ,EDIINT ,RN ) . Can any one share the techincal challeges we need to consider for estimating the whole effort . I have included some of the them based on my study .
Existing webMethods Suite of Products
B2B Server 4.6
Trading Networks 4.6
EDI 4.6, EDIINT 4.6, Rosettanet PIP 4.6
SAP Adapter 4.6
wmDB 4.6 Adapter
Proposed webMethods Suite of Products
Integration Server 6.5 SP1
Trading Networks 6.5
Modeler : 6.5.1
EDI 6.5.2 .EDIINT 6.5, Rosettanet PIP Tools 6.0.1
SAP Adapter 6.5
Monitor 6.5
wmDB 6.5 adapter ( Recommended to use JDBC Adapter package )
My webMethods Server
Technical Challenges /Major factors which need to considered
SAP Adapter
In 6.5, WmPartners is no longer a part of Integration Server and it has been included in SAP Adapter 6.5.
There is no direct upgrade from SAP Adapter 4.6 to webMethods Adapter 6.5
Rosettanet
Conversation Scripts have been replaced by Process Models in webMethods 6.5
EDI
6.5 webMethods components use flat file schemas instead of templates
Concept of record no longer available in webMethods 6.5 .It has been replaced by document (Impact needs to be analyzed ,if this effects the mapping services )
Others
Upgrade services are required to make the Integration Server 4.6 services to run with the 6.x Adapter Runtime.
Deprecated webMethods Services /Java Services
For certain components there is no direct upgrade path ( For example we need to upgrade to Modeler 6.1.5 and from Modeler 6.1.5 to Modeler 6.5.1.
Thanks and Regards
Srini
#webMethods-General#webMethods#webMethods-Upgrade#Integration-Server-and-ESB