Apptio for All

Apptio for All

A place for Apptio product users to learn, connect, share and grow together.

 View Only
  • 1.  ACE Case Study: Save Time and Effort from Manual Labor thru Datalink!

    Posted Tue November 01, 2022 01:20 AM
    Edited by Jemyla Nicole Velilla Tue November 05, 2024 06:03 PM
      |   view attached

    This is the story of how I used Apptio and TBM to help my organization…

    Before we came to a decision to automate the uploading of our "Actuals" records to be extracted every month, our Operations team is just manually extracting millions of data from external systems and manually uploads them into multiple tables in Apptio. We did this tedious task for a while, and it requires a lot of time to process the data every month. This kind of manual labor is very prone to human error and needs to be constantly reminded that it is already time to perform the extraction and loading.


    Upon exploring with Datalink, we were able to figure out that Apptio can make our lives easier and that we can be confident on high accuracy of our data. With the use of Datalink Classic, we were able to automate the processing of our data-from the extraction up to the data loading within Apptio. Thanks to Apptio, we were able to save more time and effort from manual labor and utilized the resources to more critical tasks that need human intervention.

     

    Lessons Learned

    • Ensure the correctness of the table name and column names queried from to avoid empty or incorrect data.
    • Make sure to test the query first to ensure that there are no SQL errors when the connector is run later.
    • Learned how to utilize Apptio features specifically Datalink Classic Connectors to automate efficient data loading and avoid human errors due to manual intervention.
    • Multiple queries can be run at the same time by adding the connectors into one Connector Group. This way, we can save time from setting up the schedule of the connectors one-by-one.

    @Sabeeha Kutty
    @Debbie Hagen

    #ACE #CaseStudy

    ------------------------------
    Regards,

    Jemyla Nicole Velilla
    TBMA
    ------------------------------

    ​​​​​​
    #ApptioforAll
    #Datalink

    Attachment(s)



  • 2.  RE: ACE Case Study: Save Time and Effort from Manual Labor thru Datalink!

    Posted Wed November 02, 2022 03:19 PM
    Nice work on the case study!

    ------------------------------
    Justin Kean
    Apptio
    Sr Instructor
    ------------------------------



  • 3.  RE: ACE Case Study: Save Time and Effort from Manual Labor thru Datalink!

    Posted Thu November 03, 2022 06:31 AM
    Working on something similar, as we have several data sources across web pages, databases, Excel files, etc.
    For now, we have a two-step process, whereby a Python program downloads the required files to a folded accessible by our on-prem Datalink agent.
    Then we can run the connector group, as described by @Jemyla Nicole Velilla above.
    Great!​

    ------------------------------
    Regards, Guillermo
    ------------------------------