two HMC's are managing DR servers, and two HMC's managing Prod server, all 4 HMC are part of the PEP, is it mandatory to keep all the 4 HMC 's in same level ..? DR HMC is 8.8.6 Production HMC is V9
------------------------------
sreenadh kaliyam
------------------------------