  • 1.  Mandatory follow-up WOs for certain WO classifications?

    Posted Mon January 04, 2021 10:14 PM
    MAM 7.6.1.2

    Tree removal scenario:

    Tree removal work happens in two steps.
    1. Initial WO to remove/cut down the tree
    2. 2-3 years later, the stump is removed by a contractor via a follow-up WO

    For WOs that are classified as TREE REMOVAL, is there a way to do one of the following?
    A. Automatically generate follow-up WOs when the WO is completed. Or...
    B. Prompt the user that is closing the WO through Workflow to manually create a follow-up WO.

    Any ideas?

    Thanks.


    #AssetandFacilitiesManagement
    #MaximoAnywhere
    #Maximo


  • 2.  RE: Mandatory follow-up WOs for certain WO classifications?



  • 3.  RE: Mandatory follow-up WOs for certain WO classifications?

    Posted Wed January 06, 2021 07:44 PM
    This is still a very useful question to ask and yes it does apply to Maximo Anywhere.  The scenario given is valid as does happen.  Take for example a Parks and Rec or Rail or Water where the act of say digging a hole to repair a pipe then leads then to a surface repair.  This is done be two different crews.  In rail, a cut and replace of rail then requires the weld to be tested.

    So the guidance given is still valid.

    ------------------------------
    ===============================
    Craig Kokay,
    Lead Senior Maximo/IoT Consultant
    ISW
    Sydney, NSW, Australia
    Ph: 0411-682-040
    =================================
    ------------------------------



  • 4.  RE: Mandatory follow-up WOs for certain WO classifications?

    Posted Tue January 05, 2021 09:41 AM
    I'd like to stick simple.  Use an automation script to generate the follow-up WO.  Now what way to call the script?
    - On object save, on status = COMP.  Automation script.
    - Use an escalation

    I would not lean towards to doing anything in Maximo Anywhere because this is a standard outcome of the tree cutting process.  The user doesn't have to think yes/no.  What is missing that is the question.  Is there anything that is needed from the field operator in order to be added to the stump removal.

    ------------------------------
    ===============================
    Craig Kokay,
    Lead Senior Maximo/IoT Consultant
    ISW
    Sydney, NSW, Australia
    Ph: 0411-682-040
    =================================
    ------------------------------