Hi folks,
We are facing some problems in our production environment and I think the cause is the C1 adapter.
Without any specific reason (we did not find any message in the error or server log - level 10) the C1 stop responding and about 10 minutes after that the IS hangs up. Actually, TN stop responding after C1 and before IS.
We are using IS 4.6 + JVM 1.3.1 + C1 3.0 + TN + BI + SAP/R3 Adapter 4.6.
When C1 hangs all threads has “waiting for monitor entry” status.
I tried many things, but without any success.
Does anyone faced similar problem?
Thanks in advance,
Maldonado
#Adapters-and-E-Standards#webMethods#Integration-Server-and-ESB