Originally posted by: Rowan
Below is the Planned availablity dates for the Power 6 P595 OS requirements.
April 28, 2008, for AIX 5.3 with the 5300-08 Technology Level, or later
May 28, 2008, for AIX 5.3 with the 5300-06 Technology Level and Service Pack 7, or later, and AIX 5.3 with the 5300-07 Technology Level and Service Pack 4, or later
May 30, 2008, for AIX 6.1 with the 6100-01 Technology Level, or later
July 2, 2008, for AIX 6.1 with the 6100-00 Technology Level and Service Pack 5, or later
October 24, 2008, for SUSE Linux Enterprise Server 10 for POWER, or later, and Red Hat Enterprise Linux for POWER, or later
http://www.ibm.com/common/ssi/rep_ca/7/872/ENUSAG08-0257/ENUSAG080257.PDF#AIX-Forum