IBM FlashSystem

IBM FlashSystem

Find answers and share expertise on IBM FlashSystem


#Storage
 View Only
  • 1.  Enhanced Stretched Cluster

    Posted 06/01/26 04:25 AM
    Edited by Bacil123 06/01/26 07:38 AM

    Hello Team.
    We have a fully functional IBM SVC3 2145 Enhanced Stretched Cluster spanning two sites (10km apart). IBM Flash systems (FS7300) are behind SVCs. SVC Quorum (IP) is in a 3rd site in Public Cloud. A year or more back hardware was also refreshed.
    Is it possible to convert the current setup to largely new superseded PBHA (Policy Based High Availability) Solution. Is there a IBM supported way to do that, or that would involve a huge hardware/software infra change.
    What we need to consider if we want to go for a PBHA.  Thanks in advance.



  • 2.  RE: Enhanced Stretched Cluster
    Best Answer

    Posted 06/01/26 08:17 AM

    Hi 

    There is an IBM Redbook about PB-HA which contains the migration method from Hyperswap to PB-HA. You can read it, but it does not cover the migration of Enhanced Stretch Clusters to PB-HA. However, the idea is almost the same and simple.
    https://www.redbooks.ibm.com/abstracts/sg248569.html

     
    1. Unmirror HA-volumes
    Convert all HyperSwap volumes to basic volumes and leave a volume copy on only the remaining enclosure (IO-group).
    2. Migrate non-HA-volumes
    Migrate all non-HA volumes to the remaining enclosure (IO-group).
    3. Unconfigure HyperSwap
    Change topology to standard.
    4. Remove enclosure
    If IO-group 0 is the remaining enclosure, then remove the nodes from I/O group 1. The nodes in IO-group 1 change to state Candidate.
    5. Initialize a new system
    Create a new system by using the nodes from I/O group 1.
    6. Configure policy-based HA


    ------------------------------
    Nezih Boyacioglu
    IBM Community Hero
    https://nezihboyacioglu.com
    ------------------------------



  • 3.  RE: Enhanced Stretched Cluster

    Posted 06/02/26 01:53 AM
    Edited by Bacil123 06/02/26 01:53 AM

    Thanks, Nezih. Much appreciated. so, out of the below steps, in which part there will be an outage/scheduled downtime. Unconfigure HyperSwap - Does this topo change will break something.  Remove Enclosure - Does this means physical removal of the enclosure. Initialize a new system - which new system is this.  Does this mean the process to start PBHA.  Thanks.





  • 4.  RE: Enhanced Stretched Cluster

    Posted 06/02/26 02:37 AM

    Hi Bacil,

    If you design your migration steps carefully, there will be no downtime. Unconfiguring the Stretch Cluster and changing the topology does not affect host I/O.
    You need to carefully design this process: when you remove a copy of a volume or an I/O group from the Stretch Cluster, the hosts must still be able to access the surviving copy. 



    ------------------------------
    Nezih Boyacioglu
    IBM Community Hero
    https://nezihboyacioglu.com
    ------------------------------