Original Message:
Sent: Tue September 26, 2023 02:36 AM
From: Andrey Ilinskiy
Subject: Maximo Application Suite infrastructure calculator
Yes, i used old version of calculator that is only one aviable on techXchange.
------------------------------
Andrey Ilinskiy
Original Message:
Sent: Tue September 26, 2023 02:30 AM
From: Witold Wierzchowski
Subject: Maximo Application Suite infrastructure calculator
Andrey,
first of all make sure that You are using the latest calculator (v8_10 for now). It is available in Seismic.
Secondly, it seems that You've set 'Enforce 3 Master + 2 Worker Nodes' to False - if You set it to True You will get 3 masters in calculations (each being 4x16). You can change the workers hardware spec in the bottom of the calculator.
OCP does require 3 masters (apart from SNO) and at least 2 workers - it does not have to be exactly 3 workers, can be 2 or 10 as well. Only workers are running user workloads, so total sum in calculator gives estimate for both MAS (in workers) and OCP (in masters and workers).
As for storage - there is a separate column for DB2 storage, but it is very hard to estimate that, cause it it highly dependent on how MAS is going to be used.
There is also one thing missing in the calculator: ephemeral storage size. The more apps You are going to use (or Manage add-ons) the more ephemeral storage You need.
------------------------------
Witold Wierzchowski
Original Message:
Sent: Mon September 25, 2023 05:08 AM
From: Andrey Ilinskiy
Subject: Maximo Application Suite infrastructure calculator
Hi!
I have few questions about the results of the calculation.
- There is an option "Development Env Configuration?" but it is blocked, Why and how i can change it?
- I selected "Installing into Existing OpenShift?" = No. In results I have like:
Master Nodes = 1 qty
Worker Node = 4 qty
and lower worker node's configuration
Are these requirements only for MAS to be working + OCP base requirements?
But OCP requeres at least 3 master and 3 worker nodes, isn't it?
Is it nodes with dedicated roles or can be master + worker?
3. Storage data is only for MAS or DB2 is also included here ?
------------------------------
Andrey Ilinskiy
------------------------------